Walpole High School
/Walpole High School will be getting an addition and needed renovations expanding and updating the school facilities for the 21st-century.
Read MoreWalpole High School will be getting an addition and needed renovations expanding and updating the school facilities for the 21st-century.
Read MoreThe University of Rhode Island Ocean Robotics Laboratory will be a new 27,000 sf facility enclosing a 5,000 sf staging area, including a 4500 cubic foot test tank, primary and secondary labs, shops, offices and an incubator suite.
Read MoreThe new Hingham Elementary School will be a 3 story 126,385SF for up to 605 students
Read MoreClassical High School will be undergoing a major renovation project. The renovation work incudes but is not limited to: classroom upgrades, roofing, window replacement, fire suppression systems, HVAC, electrical, fire alarm work etc.
Read MoreThe Elizabeth G. Lyons School will be located at 55 Old St, Randolph, MA, where the Devine School was previously located.
Read MorePortions of the Providence Public Work Complex Warm Truck Storage Facility had deteriorated to the point that walls were threatening to collapse and take the roof with it. Agostini Construction was contracted to enact several measures that would prolong the effective service life of the building till the new Public Works Complex could be built.
Netting was added to the unstable walls to mitigate potential damage and injury from any falling debris from the crumbling walls. Structural roof supports were installed so, should the walls fail, the truss roof would not collapse. Jersey barriers were placed to protect the shoring and structure from vehicles. Two Overhead doors were replaced. A waterline was relocated and backflow preventer added. A new fire alarm system was installed throughout the entre building. Various roof repairs were done including replacing a missing expansion joint and fixing a broken roof drain.
Location: Providence, Rhode Island
Architect: None
Value: $1.3 Million
The new Braintree South Middle School will be a new 145,580 sf, steel frame construction, two-story multi-wing building that will house up to 800 students in grades 5-8.
Read MoreThe existing Windmill facility will be renovated for grade appropriate swing space to be utilized during renovation of other Providence School facilities.
Read MoreThe Gardner Elementary School, located in Gardner MA, will consolidate Pre-K through 4th grade into a new 147,120 SF facility.
Read MoreThe New George H. Mitchell Elementary School will replace the previous George H. Mitchell Elementary School at 500 South Street, Bridgewater, MA.
Read MoreAddition and Renovations to John J. Moran Medium Security Facility
Read MoreA new three-story 160,000 SF elementary school serving Pre-K to fourth grade in Wareham, Massachusetts.
Read MoreThe new 187,100 SF Middle-High School will serve up to 860 students in grades 5-12.
Read MoreThis project will be a single story addition of 14,000 SF to the northeast corner of the existing 1990’s addition of the Mildred H. Aitken Elementary School and renovations to existing facilities.
Read MoreNew, 119,693 SF Elementary School for the City of Taunton, MA.
Read MoreThe Clyde Brown Elementary School in Millis, MA is a new 89,850 SF Elementary School located next to the current elementary school that will eventually be demolished.
Read MoreConstruction of the Apartment Building Consists of two 6 story towers with a 1 story connector between the two. There will be 122 Apartment Units within the two towers, which will house 500 students.
Read MoreNew, 90,975 SF elementary school for the Town of Needham.
Read MoreThis project includes construction of a single story building with a clerestory and partial
basement encompassing approximately 26,600 GSF.
New 92,000 SF, 3-story steel construction building, including a 8,000 SF, 1-story gymnasium with a pre-engineered steel frame.
Read More