Millis New Police Station and Renovations to the Fire Station
/Construction of new 10,400 square foot police facility and a total renovation to a 9,500 square foot of existing fire station.
Read MoreConstruction of new 10,400 square foot police facility and a total renovation to a 9,500 square foot of existing fire station.
Read MoreThe Fiske and Schofield Elementary Schools are scheduled to undergo extensive renovations over an eight-week period during summer vacation. Renovations include upgrades to the HVAC System, fire protection upgrades, plumbing, fire alarm, security, electrical and interior fit-up.
Read MoreThe University of Massachusetts Dartmouth Charlton College of Business is scheduled to receive a 20,600SF addition to their existing building. The new academic wing is constructed of an ultra high performance concrete rain screen system along with a metal panel and curtain wall system.
Read MoreAgostini Bacon Joint Venture is excited to announce that they have been awarded the contract on the new J. Henry Higgins Middle School in Peabody, MA.
Read MoreThe new science academic building at the University of Rhode Island campus is a 134,623SF building that will house the university’s New Center for Chemistry and Forensic Sciences program. The façade of the new building consists of phenolic panels, curtain wall, brick and manufactured stone providing a unique look on campus.
Read MoreThe Greater New Bedford Regional Vocational Technical High School recently added two new additions to the existing 460,766SF high school. Block K is a 16,682SF three-story classroom wing constructed of structural steel, masonry veneer and architectural precast panels.
Read MoreAgostini Construction was selected by Johnson & Wales University as their Construction Manager to complete the renovations to the Harborview Residence Hall located at 1150 Narragansett Boulevard. Agostini joins the University’s Architect Robinson Green Beretta Corp. (RGB) on this phased renovation project.
Read MoreThe new Somerset Berkley Regional High School in Somerset, MA, is a 222,826SF masonry and steel building. The new school consists of a 3-story classroom wing, a new gymnasium with an elevated running track, an adjoining fitness area, an auditorium, a cafeteria, a media center and a large group lecture hall.
Read MoreThe construction of the New Franklin High School, a 306,543 SF state of the art facility with a masonry façade and light gauge framing back-up, consists of a three story classroom wing, a single story gymnasium with an elevated running track, adjoining fitness area, an auditorium, cafeteria, media center and a large group lecture hall.
Read MoreThe new facility for the Rhode Island School for the Deaf provides 61,100 SF of new academic space to replace the former school at Corliss Park in Providence and included renovating the existing 12,400 SF gymnasium.
Read MoreThe Danvers High School underwent renovations of approx. 157,000SF of the existing facility and demolition of selected areas. A new 92,000SF addition was added to the existing facility.
Read MoreThe new elementary school is a 103,000SF facility consisting of a lower school and upper school. The two wings are joined together by a centrally located administration area, cafeterium and gymnasium.
Read MoreThe new two-story 119,000SF middle school consists of a common core space which houses the 250 seat cafetorium, media center, gymnasium and administration offices.
Read MoreThe town of Rockland recently renovated their existing 162,000SF high school and added a 110,000SF addition for the new John Rogers Middle School. The project included the complete “gut-renovation” of the existing high school while it was occupied in five separate phases.
Read MoreA new 77,562SF, 300 bed dormitory and 36,000SF dining facility was constructed at the Bridgewater State College main campus. This Goody, Clancy and Associates designed project consists of two new buildings joined by a beautiful patio/walk area.
Read MoreThe new 53,000SF addition recently completed at the Foxborough Regional Charter School consists of a two-story building, which provides the school with twenty seven new classrooms, a new administrative and programming area and a new double gymnasium.
Read MoreThe project consisted of various renovation phases to the existing 496,503 SF three story high school and middle school building and a new 62,365 SF three story middle school addition.
The renovations included significant code upgrades, reconfiguration of spaces to meet the school’s academic programs, new roofing, replacement windows, and new MEP/FP system upgrades.
Project took three years to complete. During all phases of work the school was occupied during the school year.
Location: Taunton, MA
Architect: The Design Partnership of Cambridge
Value: $93,000,000.00
Once again Agostini Construction Company is partnering with Ai3 Architects to build the Norwood High School. The building consists of shallow concrete foundation, steel structure, composite metal/concrete decks, exterior CFMF with masonry veneer skin.
Read MorePhase II of the U-Mass Cedar Dell Complex project consists of exterior and interior renovations of (7) two story wood frame apartment style dormitories, consisting of 64 multi-bedroom units and common spaces.
Read MoreThe new 24,000SF Townhouse O&P Dormitories located on Bryant University's Smithfield campus are constructed of wood framing with a cement fiberboard and brick veneer exterior.
Read More